Here is Stav's (aka Keith Johnson) 7, a 1.4 classic, which
arrived 14:45 on the 19th Aug and was finished at 10:00
on the 28th Aug. A total build time of 84 hours, it took
me longer to add it to this site than it took to build!
SVA was scheduled for 19th Sept, hope everything went OK.
Latest pics taken at Stoneleigh 2003